Window and Door Replacement Planning Worksheet for Minnesota Homes
Send the finished list and three photos per opening. We reply within one business day.
Reply within one business day. Or call / text 763-250-3621.
How to plan window replacement: walk the house room by room and write five things for every opening: the room, the opening, the window style, the problem and a priority. Openings that leak, have fogged glass, soft or rotted sills, or a bedroom window that will not open go to the top. JMB Builders prices the finished list per opening and installs it in one order or in phases.
- Priced per opening
- Five columns: room, opening, style, problem, priority
- MN Lic. BC809005

November is when people notice their windows. The first cold morning shows you the frost on the glass, the draft at the sash, the fog between the panes. It is also a good time to plan. The problems are easy to see, and a list made now can be measured, quoted and ordered over the winter for install after the thaw.
The plan is a worksheet. One line per opening, five columns: room, opening, style, problem, priority. Walk the house with a pad or your phone, start at the front door and go clockwise, floor by floor. Do the doors on the same walk: entry, patio, garage service door. Number every opening so the photos and the list line up. Do not skip the basement or the room over the garage.
Then rank them. Water comes first: a window letting water into the wall does damage every rain. Next, failed seals and broken glass. Then rot in the sill, the brickmould or the bottom of the sash. Then bedroom windows that will not open or are too small to climb out of; an egress window has to meet the code, and we check that when we measure. Then the cold side of the house, usually north and west. The rest are comfort and looks.
The finished list plus three photos per opening is a complete quote request. We read it, ask what is missing, and price each line. If the list is too long to do at once, the same list becomes a phased plan with the product written down so every phase matches.
Hail or wind damage? Start with the 10-minute window and door check. · How a storm claim works with us
Get a written quote for this job
Three photos and a sentence is enough: a reply within one business day, or ask for a free in-home estimate. Or text the photos to 763-250-3621.
What you supply
- A numbered list of every window and door, with room and floor
- The style of each one as it is now: double-hung, slider, casement, picture, door
- What is wrong with each: drafty, fogged, rotted, stuck, broken, or just old
- Your priority for each line: now, next, later
- Three photos per opening: inside, outside, and a close-up of the problem
- Your pick of brand, frame color and grilles, or a question about them
What JMB supplies
- A read of the list and photos, with questions on anything unclear
- A measure of every opening before anything is ordered
- A check of bedroom windows against the egress code
- A quote with one line per opening, numbered to match your list
- Product options such as Andersen, Silver Line, MI, Ply Gem or ProVia windows and Therma-Tru or Masonite doors
- A written phase plan with brand, series, color and glass, when you split the work
- Removal of the old units, install, flashing, insulation and interior trim, room by room
How it is priced: per opening
Quoted in writing from your photos, with a reply within one business day. What moves the number:
- How many openings are on the list and how many go on the first order
- Insert or full-frame replacement for each opening
- Window style and size: a large casement or picture window is more than a small slider
- Rot found in the sill, jamb or framing once the old unit is out
- Egress: enlarging a bedroom opening is a different job from a same-size swap
- Second-story or walkout-level access
- Interior trim and exterior capping or cladding for each opening
- One order or phases: each phase repeats the measure, order and setup
Send the finished list and three photos per opening: inside, outside, and a close-up of the problem. We reply within one business day. Or book a free in-home estimate and we fill it in with you.
How long it takes
Plan and measure now. Windows and doors are made to order, so the wait is the order; the lead time is on the quote. Once here, most openings go in at a few per day, each room closed the same day.
How your project works
- 1
Send photos, get a written quote
Send three photos of the space and a sentence about what you want. You get a clear, itemized reply within one business day. Prefer a look in person? A free in-home estimate is always an option.
- 2
Pick materials, or bring your own
We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.
- 3
Clean, precise installation
The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.
- 4
Walkthrough and invoice
We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.
Situations and options
Room
Write the room and the floor: kitchen, main; bedroom 2, upper; family room, lower. It tells us how we get there, what furniture moves, and whether a bedroom window has an egress question.
Opening
Give each opening a number and say where it is on the wall: left of the sink, over the stairs, the pair on the north wall. A rough width and height helps, but we measure before ordering. Count mulled units, like a picture window with two side windows, as one opening.
Style
Write what is there now: double-hung, single-hung, slider, casement, awning, picture, bay or bow, garden, or a door. Add what you want if it is different; a slider to a casement is fine to ask for.
Problem
One short note per opening: drafty, fogged between the panes, frost on the inside, soft sill, sash will not stay up, cranks broken off, water stain on the drywall below, or just old. If it is fine, write fine.
Priority
Mark each line now, next or later. Now: water getting in, broken or fogged glass, rot, a bedroom window that will not open. Next: the cold north and west sides. Later: windows that work but look tired. That column decides one order or phases.
Photos
Three per opening, numbered to match the list. One from inside showing the whole window and its trim. One from outside showing the whole window and the siding around it. One close-up of the problem: the fog, the soft sill, the stain, the broken crank.
One order or phased
One order means one measure, one order, one install run, and every window from the same production batch. Phased means the same list split by priority, with the product written on the plan so later phases match. Both start from the same worksheet.
Window and Door Replacement Planning Worksheet for Minnesota Homes: questions, answered
Which windows should I replace first?
Replace the windows that let water into the wall first, because they do damage every time it rains. Next come fogged or broken glass and rot in the sill, brickmould or the bottom of the sash. Then bedroom windows that will not open or are too small to climb out of, since those are a safety issue. After that, the cold side of the house, usually north and west. Windows that work but look tired can wait.
Is it cheaper to do all the windows at once?
Usually, per window, yes. One order means one measure, one order, one delivery and one install run, so the setup is paid once. A phased plan repeats those steps for each phase, and prices from the manufacturer can change between phases. Phasing makes sense when the budget is split across years. Rank the list, put the urgent openings on the first order, and write the product down so the next phase matches the first one.
Can I plan now and install in spring?
Yes. That is a good reason to make the list in November. You make the worksheet and photos now, we review them and measure, and the quote lists every opening. Windows and doors are made to order, so the order goes in over the winter and the install follows after the thaw. The lead time depends on the brand and is written on the quote, so you know before you sign when to expect the install.
What should I write down for each window?
Five things per opening: the room and floor, a number and where it sits on the wall, the style as it is now, the problem, and a priority of now, next or later. We measure every opening before ordering. Then take three photos: inside, outside, and a close-up of the problem. Number the photos to match the list so nothing gets mixed up.
Should doors be on the same order?
Put them on the same worksheet, even if they go in later. An entry door or patio door sits in the same walls as the windows, so frame color, grilles and hardware finish should match. A door on the same order shares the measure and install run. If the door is fine, write fine and leave it at later. If it sticks, leaks at the threshold or lets daylight past the weatherstrip, mark it now or next.
Can you fill in the worksheet with me?
Yes. Book a free in-home estimate and we walk the house with you, room by room, and fill in every line as we go: room, opening, style, problem, priority. We measure while we are there and take the photos ourselves. You can also start the list, send it with photos, and finish it with us at the visit. Either way the finished list becomes the quote, one line per opening.
Recent JMB work, from our job log
59 installs recorded across 30 Twin Cities communities since Dec 2025. Window and door installs for homeowners and the builders we work with. Counts come straight from our job log; no customer names.
Whole house, several, or just one
Send photos and we reply within one business day, or book a free in-home estimate.
Related jobs we do
Replace All the Windows at Once, or a Few at a Time? How to Decide
You know the windows need to go. The question is whether to do them all this year or a few at a time, and how to keep phase three matching phase one.
Read moreWhole House Window Replacement — One Measure, One Order, Room by Room
Every window in the house at once: one measure, one order, one schedule, and the house closed up every night.
Read moreWhat Should a Whole House Window Quote Include? A 12-Point Checklist
You are about to sign for fifteen or thirty windows. Before you do, check the quote against this list so nothing you assumed was included turns into a change order.
Read moreReplace Several Windows — 2 to 9 Openings on One Order
A handful of windows have gone bad and the rest can wait. Here is how a job of two, three to five, or six to nine windows runs, and which ones to pick first.
Read moreWindow Quote From Photos — Send Three, Get a Written Quote
Twenty windows, one evening, a phone and a tape measure. Here is how to shoot them so the first number means something.
Read moreEntry and Patio Door Package — Front Door and Slider on One Order
The front door and the slider are both due, and doing them separately means two colors that almost match and two hardware finishes that do not. One order fixes that before it happens.
Read morePage reviewed November 22, 2026 · JMB Builders LLC, MN license BC809005 · All whole-house projects pages
Where we work
Whole-House Window & Door Projects near you
Based in Zimmerman, scheduling across the Twin Cities metro. A few of the towns we cover: