Skip to content
JMB Builders logo

Replace Carpet With LVP — Carpet Out, Vinyl Plank In, One Crew

Worn, stained or allergy-trapping carpet out of the bedrooms, the living room or the whole main floor — and waterproof vinyl plank in its place, with the trim and doors handled by the same crew.

Reply within one business day. Or call / text 763-250-3621.

To replace carpet with LVP, JMB Builders cuts the carpet into strips and rolls it out with the pad, pulls the tack strip and every staple, fills and flattens the subfloor, then installs the vinyl plank with new transitions at each doorway and the base and shoe reset. Doors get trimmed if they no longer clear. Carpet and pad are hauled away. Twin Cities metro, priced per project, quoted from your photos, with a reply within one business day.

  • Priced per project, carpet removal included
  • Tack strip, staples and pad out, subfloor flattened
  • Carpet and pad hauled away
Casement window with stained wood casing in a freshly floored room

Carpet to LVP is the most common flooring job in a Twin Cities house right now: bedrooms, a family room, or a whole main floor that has had the same carpet since the house was built. The plank install is the same as any LVP job. What makes this one different is the demo, and the demo is where the sloppy jobs show.

Carpet comes up in strips and goes out the door with the pad. Then the tack strip comes off the perimeter, and the staples that held the pad, hundreds of them, get pulled or driven flush, because a single staple left proud shows through the plank. The subfloor gets checked for squeaks and screwed down, and the low spots that the carpet pad was hiding get filled. Then the planks go in.

The carpet was thicker than the plank, so the baseboard was set high to sit on it. We either add shoe mould to close the gap or drop the baseboard, depending on what looks right and what you want to spend. Doors that were cut for carpet usually clear the new floor with room to spare.

Get a written quote for this job

Three photos and a sentence is enough: a reply within one business day, or ask for a free in-home estimate. Or text the photos to 763-250-3621.

Photos (optional)

Up to 3: one wide shot of the area, one close-up of the opening or trim, one of anything you're unsure about.

How do you want your quote?

Free, no obligation. Every quote is written and itemized, so you can compare it line by line.

What you supply

  • The planks and matching transitions, with about ten percent extra, or have us supply them
  • Rooms emptied of furniture, or tell us and we will quote moving it
  • Your choice: add shoe mould to the existing base, or drop and reset the base

What JMB supplies

  • Carpet, pad, tack strip and staple removal, and haul-away of all of it
  • Subfloor prep: screws for squeaks, floor patch or leveler for the dips, a vacuum before the planks
  • Underlayment where the planks need it
  • LVP installed with staggered joints and the expansion gap the maker calls for
  • Transitions at each doorway to the floors that stay, and a stair nose where the carpet stays on the stairs
  • Shoe mould added, or baseboard dropped and reset, ready for paint
  • Doors trimmed if any rub
  • Photos of the finished floor in your job folder
  • Painting of new shoe or base when you want it, quoted as its own line

How it is priced: per project

Quoted in writing from your photos, with a reply within one business day. What moves the number:

  • Square footage of carpet coming out and plank going in
  • How many rooms and closets — each closet is its own small floor with its own cuts
  • Subfloor condition under the carpet: pet stains, a soft spot, or an old squeak that needs screws
  • Whether the carpet is glued down (rare in houses, slow to remove) or stretched over pad
  • Transitions to the rooms and stairs that stay carpeted or tiled
  • Shoe mould vs. dropping the baseboard
  • Furniture that has to be moved room to room during the job

Send a photo of each carpeted room, a close-up of the carpet edge at a doorway, and the plank you picked. Pull back a corner of carpet if you can and photograph what is under it.

How long it takes

Two bedrooms: one day, carpet out and planks in. A whole main floor: two to three days, with the carpet out of each room the same day its planks go in so you are never walking on bare subfloor overnight.

How your project works

  1. 1

    Send photos, get a written quote

    Send three photos of the space and a sentence about what you want. You get a clear, itemized reply within one business day. Prefer a look in person? A free in-home estimate is always an option.

  2. 2

    Pick materials, or bring your own

    We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.

  3. 3

    Clean, precise installation

    The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.

  4. 4

    Walkthrough and invoice

    We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.

Situations and options

Bedrooms only

The common first step. Carpet out of the bedrooms and closets, planks in, transitions at the hall if the hall stays carpeted. Doors and base handled in the same visit.

Whole main floor

Living room, dining, hall and bedrooms in one continuous floor with no transitions between rooms. Planks run in one direction through the whole space, laid out from the longest sightline.

Basement family room

Carpet on a slab often hides damp. The carpet comes out, the slab is tested for moisture and flattened, and a below-grade rated plank floats over a vapor barrier.

Stairs stay carpet, floors go plank

The usual choice, since carpeted stairs are quieter and safer. A stair nose at the top step and a transition at the bottom finish the edge. If you want the stairs done too, see the treads-and-risers page.

Replace Carpet With LVP — Carpet Out, Vinyl Plank In, One Crew: questions, answered

What is under my carpet, and does it matter?

In most Twin Cities houses it is plywood or OSB subfloor on the main and upper floors and a concrete slab in the basement. Older houses sometimes have an original hardwood floor under the carpet, which changes the conversation entirely. Pull back a corner in a closet and send a photo. The subfloor decides the prep, and the prep is most of the labor.

Do you haul away the old carpet?

Yes. Carpet, pad, tack strip and staples all leave with us. We cut the carpet into rolls that fit in the truck and it goes to the transfer station. If your city offers a bulky pickup you would rather use, we can stack it at the curb instead.

Can you do just the bedrooms and leave the carpet in the hall?

Yes. A transition strip at each bedroom door holds the carpet edge tight and covers the end of the planks. It is a very common way to do this in stages: bedrooms this year, the hall and living room when the budget allows, matching planks from the same line.

Will the LVP be lower than the carpet was?

Usually, by a little. Carpet and pad together are thicker than a vinyl plank. The base was set to sit on the carpet, so there is a gap under it once the plank is in. Shoe mould covers that gap and is the quick fix; dropping the baseboard to the new floor is the cleaner one. Doors that cleared the carpet clear the planks.

Can the stairs stay carpeted?

Yes, and most people leave them. Carpeted stairs are quieter and give better footing. We finish the top step with a stair nose in the plank color and the bottom with a transition to the carpet. If you want the stairs redone in wood or plank, that is a separate job we also do.

How long does it take to replace carpet with LVP on a whole main floor?

Two to three days for a typical main floor, including trim. We work room by room: carpet out, subfloor prepped, planks in, then the next room. Furniture shifts from the room we are in to the one we just finished. You are not living on bare subfloor at any point.

Recent JMB work, from our job log

59 installs recorded across 30 Twin Cities communities since Dec 2025. Window and door installs for homeowners and the builders we work with. Counts come straight from our job log; no customer names.

Related jobs we do

Page reviewed October 1, 2026 · JMB Builders LLC, MN license BC809005 · All flooring pages

Where we work

Flooring near you

Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: