JMB Builders logo

Door Hanging Subcontractor — Interior Door Install Crew for Builders

The door package is stacked in the garage, drywall is done, and your trim carpenter is a week out. We hang and case the house as a per-door sub and leave the punch list short.

JMB Builders works as a door hanging subcontractor for Twin Cities builders: we take the door package delivered to the house, set every prehung interior door plumb with even reveals, shim behind each hinge and the strike, case both sides in the spec profile, and install the hardware, priced per door. Bifolds, bypasses and pockets are on the same rate sheet. One crew, photos of every door, one invoice per house.

  • Priced per door, whole house on one invoice
  • Prehung, bifold, bypass and pocket doors
  • Cased both sides, hardware set
  • Photos of every door in the job folder
  • Licensed MN contractor BC809005
Carpenter checking a door and casing in a new Twin Cities home

Hanging doors in a new house is a production job. The package shows up as a stack of prehung units, a bundle of casing and a box of hardware, and the difference between a good crew and a bad one shows up at the one-year walkthrough: doors that latch, reveals that stay even, casing miters that did not open. We run that scope as a subcontractor for builders and framers who want the doors done by a crew that does nothing else that day.

The way we hang a door is the same on every door. Check the rough opening and the floor for level. Set the unit, plumb the hinge jamb, shim behind every hinge and behind the strike, and screw through the hinge jamb into the framing so the door cannot sag. Set the reveals even around the slab, then case both sides in the spec profile with tight miters, nailed and ready for the painter. Hardware goes on last, strikes adjusted so the door latches without slamming.

Bifolds, bypass closet doors and pocket doors are on the same rate sheet, because a door crew that skips them leaves the builder finding someone else for the closets. Cased openings and attic access are line items. We can run base too, or leave it for your base crew, and we send photos of every door so your super can check the house without driving to it.

What you supply

  • The door package on site: prehung units with the schedule, casing stock, hardware and closet door kits
  • The door schedule with sizes, handing and hardware per opening, or we work from the plan and the units
  • Rough openings framed to the schedule, drywall done, floor level enough to set a door on
  • Casing profile and reveal spec, and whether we run base or leave it
  • Your super's number and the target date, so we can hold the slot

What JMB supplies

  • One crew that hangs the whole house, prehung swing doors, bifolds, bypasses and pockets
  • Shims, screws through the hinge jamb, casing nails, and filler on the nail holes if the spec calls for it
  • Casing both sides in the spec profile, cased openings and attic access on the same visit
  • Hardware set: knobs or levers, privacy and passage, strikes adjusted, bifold and bypass hardware and guides
  • A check of every door for latch, swing and reveal before we leave
  • Photos of every door in the job folder, one invoice per house with your job number on it
  • Painting of doors and casing when the builder wants it, quoted as its own line

How it is priced: per door

Quoted in writing from your photos within one business day. What moves the number:

  • Prehung swing door vs. bifold, bypass or pocket, each at its own rate
  • Casing profile: flat stock and a butt joint vs. a wide profile with mitered corners
  • Solid-core vs. hollow-core doors, which changes the handling and the hinge screws
  • Hardware included vs. hardware set by your locksmith or the builder
  • Base run with the doors vs. left for another crew
  • Houses per month from the same builder, which sets the standing rate

Send the door schedule and the casing spec. That is enough for a per-door rate on the house, and the rate holds for the next house if the spec is the same.

How long it takes

A typical single-family house of prehung doors, closet doors and casing: one to two days for the crew. Pocket doors and cased openings add hours, not days.

How your project works

  1. 1

    Send photos, get a written quote

    Send three photos of the space and a sentence about what you want. You get a clear, itemized quote within one business day. We only come out to measure first when the job needs a tape measure — no pressure, no games.

  2. 2

    Pick materials, or bring your own

    We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.

  3. 3

    Clean, precise installation

    The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.

  4. 4

    Walkthrough and invoice

    We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.

Situations and options

Hang and case only

Prehung doors set, shimmed, screwed and cased both sides. Hardware and base left to others. The fastest scope when the builder's hardware comes later.

Hang, case and hardware

The full door package: hung, cased, knobs or levers set, strikes adjusted, closet doors on their track. The house is ready for the painter when we leave.

Doors, casing and base

We run baseboard and shoe with the doors so one crew does all the trim on the house and the joints between casing and base are ours to get right.

Closet doors only

Bifolds, bypasses and pocket doors on a house another crew hung. Tracks set level into the header, pivots and guides adjusted, doors meeting flush.

Door Hanging Subcontractor — Interior Door Install Crew for Builders: questions, answered

Do you hang doors as a subcontractor for builders?

Yes. JMB Builders hangs and cases interior doors for Twin Cities builders as a per-door subcontractor: prehung swing doors, bifolds, bypasses and pocket doors, cased both sides in the spec profile, hardware set. One crew does the house, sends photos of every door, and invoices per door with your job number on it. Licensed Minnesota residential building contractor, BC809005.

How much does a door hanging crew charge per door?

It is a per-door rate set by the door type and the casing spec: a prehung swing door with flat casing is the base rate, wide mitered casing, solid-core slabs, pockets and hardware each move it. We do not publish a number because the spec changes it; send the door schedule and the casing profile and you get a per-door rate for the house within a business day. The rate holds house to house on the same spec.

How many doors can your crew hang in a day?

Enough to do a typical single-family house in one to two days with casing and hardware. A crew that only hangs doors moves faster than a trim carpenter fitting the doors in between everything else, because the setup, the shim stock and the rhythm are the same door after door. Pocket doors and cased openings take longer than swing doors and we plan for them.

What do you need on site before the door crew shows up?

The door package delivered and inside, drywall finished and dry, floors clean enough to set a door on and level enough to hang one, and the schedule with handing and hardware per opening. If the base is going in with the doors, the base stock is there too. If the openings were framed off the schedule, tell us before the day so we bring the material to fix it rather than finding out on site.

Do you install the door hardware too?

Yes, when the builder wants it on the same visit. Knobs or levers, passage and privacy, deadbolts on the garage entry, strikes set so every door latches without slamming, closet door pulls and guides. Some builders have a locksmith or the hardware supplier set it later; either way is on the rate sheet.

What happens if a door does not latch at the one-year walkthrough?

We come back and fix it. Doors that stop latching in the first year are usually the house settling or the hinge screws going only into the jamb, which is why we screw through the hinge jamb into the framing on every door. When a builder sends us the walkthrough list, we handle our doors and any other trim items on it as a warranty visit with photos.

Get a written quote for this job

Three photos and a sentence is enough. You hear back within one business day. Or text the photos to 763-204-2099.

Free quote from your photos in one business day · No obligation · Licensed contractor

Photos (up to 3 — the fastest way to a price)

One wide shot of the room or wall, one close-up of the trim or opening, one of anything you're unsure about.

Related jobs we do

Page reviewed September 24, 2026 · JMB Builders LLC, MN license BC809005 · All builders pages

Where we work

Builders near you

Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: