Exterior Trim Subcontractor — Trim Crew for Siding Companies
Your siding crew is fast at siding and slow at trim, or the trim is the reason the house is not done. We do the window, door and corner trim on your schedule as a per-opening sub.
JMB Builders runs an exterior trim subcontractor crew for siding companies and builders across the Twin Cities metro. Your crew hangs the siding; we do the trim around it: LP or PVC window and door casings with drip caps, corner boards, frieze and band boards, and garage door trim, flashed to the housewrap before your siding meets it. Priced per opening, with the linear trim as line items, one invoice per house, photos of every opening.
- Priced per opening, corners and frieze by the foot
- LP SmartSide or PVC trim, flashed and sealed
- Runs ahead of or behind your siding crew
- Photos of every opening, one invoice per house
- Licensed MN contractor BC809005

On a sided house the trim is where the water gets in or does not. The window and door casings, the drip caps over them, the corner boards and the frieze under the soffit all have to be flashed to the housewrap and lapped so the siding sheds onto them, not behind them. A siding crew that is paid by the square runs the siding well and treats the trim as what slows them down. We do the trim as its own trade so both scopes get done by people who are good at them.
The way it usually runs: your crew wraps the house and sets the windows, or the builder's window crew does. We come in and do all the trim on the house, casings with a drip cap at every head, corner boards, frieze and band boards, garage door trim and any mounting blocks, taped to the wrap and ready for the siding to die into. Your crew follows with the siding, and the J-channel or the lap meets a trim board that is already flashed. On some jobs we trim behind the siding instead, when the siding is up and the trim was skipped or done wrong.
Material is the siding company's call. LP SmartSide trim in the widths on the spec, cellular PVC where the spec or the exposure calls for it, aluminum-wrapped where the house is getting coil. We supply it or bill through yours. Every opening gets a photo before the siding covers the flashing, which is the photo that settles the argument when a window leaks two years later.
What you supply
- The job: address, elevation drawings or a window count, trim spec (material, widths, drip cap type) and the date your siding crew starts
- Housewrap on and windows set before we trim, or we set the windows too as part of the scope
- Trim material if you buy it through your supplier; otherwise we supply LP or PVC and bill it through
- Who talks to the homeowner or builder about changes: your PM or us, your call
What JMB supplies
- Window and door casings in LP or PVC to your widths, with a metal drip cap at every head, taped to the wrap
- Corner boards, frieze, band boards, gable trim and garage door trim, flashed and sealed at every joint
- Mounting blocks for lights, hose bibs and vents, cut in and flashed
- Window and door installation as part of the scope when the builder or siding company wants one crew for both
- Stainless or coated fasteners, flashing tape, sealant, and cut ends primed on LP trim
- Photos of every opening before the siding covers the flashing, in the job folder
- One invoice per house, per opening with linear trim as line items, with your job number on it
How it is priced: per opening
Quoted in writing from your photos within one business day. What moves the number:
- Openings on the house, and how many are windows vs. doors vs. garage doors
- Linear feet of corner board, frieze, band and gable trim, quoted by the foot alongside the openings
- LP SmartSide vs. PVC vs. aluminum-wrapped trim
- Trim widths and any built-up head casing or sill nose detail on the spec
- Trim ahead of the siding on a bare wrapped wall vs. behind the siding on a house already sided
- Two-story and gable work that takes staging
- Houses per month from the same siding company, which sets the standing rate
Send the elevations or a window count and the trim spec. That is enough for a per-opening rate with the linear trim priced by the foot, and it holds on the next house with the same spec.
How long it takes
Trim on a typical single-family house ahead of the siding: two to three days for the crew. Behind existing siding, about the same plus the time to cut the siding back at each opening.
How your project works
- 1
Send photos, get a written quote
Send three photos of the space and a sentence about what you want. You get a clear, itemized quote within one business day. We only come out to measure first when the job needs a tape measure — no pressure, no games.
- 2
Pick materials, or bring your own
We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.
- 3
Clean, precise installation
The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.
- 4
Walkthrough and invoice
We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.
Situations and options
Trim ahead of your siding crew
The house is wrapped and the windows are set. We trim every opening, run the corners and frieze, and leave the wall ready for your crew to side up to. The cleanest sequence for flashing.
Trim behind the siding
The siding is up and the openings were left in J-channel or bare. We cut the siding back, add PVC or LP trim with a drip cap, and reseal so the trim laps the siding correctly. Common on a house another crew walked away from.
Windows, doors and trim in one crew
We set the windows and doors on the wrapped house and trim them in the same visit, so the flashing sequence is one crew's responsibility from the nail fin to the drip cap.
Corners, frieze and band only
Your crew does the window trim as part of the siding but wants the corner boards, frieze and band boards run first. We do the linear trim by the foot and leave the openings to you.
Exterior Trim Subcontractor — Trim Crew for Siding Companies: questions, answered
Do you subcontract exterior trim for siding companies?
Yes. JMB Builders runs exterior trim as a subcontractor for Twin Cities siding companies and builders: window and door casings with drip caps, corner boards, frieze, band boards, gable trim and garage door trim in LP or PVC, flashed to the housewrap. We trim ahead of your siding crew or behind it, invoice per opening with the linear trim by the foot, and put a photo of every opening in the job folder before the siding covers the flashing.
How do you price exterior trim per opening?
Each window and door opening has a rate based on the trim spec: material, widths, whether there is a built-up head or a sill nose, and whether we are trimming a bare wrapped wall or cutting back existing siding. Corner boards, frieze and band boards are priced by the linear foot on the same sheet. Send the elevations and the spec and the rate for the house comes back within a business day; it holds for the next house on the same spec.
Should exterior trim go on before or after the siding?
Before, on most siding types. The casings and corner boards are flashed to the housewrap with tape and a drip cap at the head, and the siding is then cut to meet them, so any water on the siding sheds onto the trim and out. Trim added after the siding has to be cut in and relies on sealant at the joint. We do both, but ahead of the siding is the sequence we recommend to every siding company we work with.
Do you install LP SmartSide trim?
Yes, it is the most common trim spec on Twin Cities siding jobs, and we install it to the manufacturer's instructions: cut ends primed, the gap left at the joints for expansion, the right fasteners at the right spacing, a drip cap at every head, and sealant where the spec calls for it. We do PVC trim the same way with its own fastening and joint rules, and aluminum-wrapped trim where the house is getting coil.
Can you set the windows and doors too, not just the trim?
Yes. Installing windows and doors as a sub is most of what we do for window companies, and on a siding job it means one crew is responsible for the flashing from the nail fin through the drip cap. We set the units in the wrapped opening to the manufacturer's instructions, tape them, trim them, and photograph each one before the siding goes on.
How do you invoice a siding company?
One invoice per house, per opening with the linear trim as line items, with the address and your job number on it, sent when the photos are in the folder. Paid by check or direct deposit. If you run several houses a month we can batch them on one invoice per month, whichever your office prefers.
Get a written quote for this job
Three photos and a sentence is enough. You hear back within one business day. Or text the photos to 763-204-2099.
Related jobs we do
Exterior Window Trim After New Siding Replacement
The siding is done, the windows are sitting in a thin strip of J-channel, and the house still looks unfinished. We trim them out in boards that shed water and last.
Read moreGarage Door Trim for Builders — Jamb and Trim Package per Opening
The garage door company will not hang the door until the jambs are in, and the siding crew does not do jambs. We trim the opening so the door goes in on schedule and the jamb bottoms do not rot in five years.
Read morePVC Exterior Trim Replacement — Swap Rotting Wood for Cellular PVC
You have painted the same trim three times and it still rots at the bottom. Cellular PVC ends that, as long as it is flashed, glued and fastened the way the material needs.
Read moreInstall & Trim-Out Crew for Window Companies
Your sales team sold the windows. Your install crew set them. The homeowner is now looking at bare jambs and asking who does the trim. That is the call we take.
Read moreCloset Shelving Package for Builders — Spec Home Closet Shelving
Every closet in the house needs a shelf and a rod before the walkthrough, and your trim crew would rather not. We do the whole house as a package, wire or wood, to your plan.
Read moreDoor Hanging Subcontractor — Interior Door Install Crew for Builders
The door package is stacked in the garage, drywall is done, and your trim carpenter is a week out. We hang and case the house as a per-door sub and leave the punch list short.
Read morePage reviewed September 24, 2026 · JMB Builders LLC, MN license BC809005 · All builders pages
Where we work
Builders near you
Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: