Small Bathroom Remodel Contractor — Tile Floor, Vanity, Trim and Paint
The hall bathroom is fine but dated: builder vanity, vinyl floor, hollow door — a remodel that keeps the walls and plumbing where they are and replaces everything you touch and see.
JMB Builders is a small bathroom remodel contractor for the Twin Cities metro: the hall bath or powder room gets a new tile floor, the vanity and top set level and scribed to the wall, new base, casing and door, and paint. A licensed plumber does the vanity hookup and any valve work. Priced per project, quoted from your photos within one business day.
- Priced per project
- Tile, vanity, trim, door and paint by one crew
- Licensed plumber for the hookup and valves
- Quote from photos in 1 business day
- Licensed MN contractor BC809005

Most bathrooms do not need a gut. The tub is fine, the toilet works, the layout is the only one that fits. What is dated is the floor, the vanity, the trim and the door. That is a carpentry and tile job with a plumber for two hours, and it is what this page covers: a hall bath, kids' bath or powder room updated without moving a pipe.
The order matters. Old vanity and floor out, subfloor checked, tile set and grouted, then the vanity goes on top of the finished floor so the toe kick and the tile meet cleanly. Base, casing and a new door go on after that, the plumber sets the faucet and drain and swaps the shutoffs, and paint is last. Doing it in that order is what makes it look like it was built that way instead of updated.
What you supply
- The vanity, top, sink and faucet, or product names and we price them in
- Floor tile and grout color, or tell us the look and we bring samples
- The mirror, light and towel bars you want hung
- Your paint color, or leave the walls for later
- The door and hardware if it is being replaced, or we supply a primed door to match the others
What JMB supplies
- Removal of the old vanity, floor, base, casing and door, hauled away
- Subfloor check and repair at the toilet and vanity if the old floor was leaking
- Cement board or uncoupling membrane, tile set flat, grouted and sealed
- The vanity set level, scribed to the wall and secured, with the top and backsplash set
- A licensed plumber for the faucet, drain, shutoffs, toilet reset and any tub or shower valve
- New base, casing and door hung with the hardware, all filled and caulked
- Mirror, light and towel bars mounted into blocking or proper anchors
- Painting of walls, ceiling and trim as its own line on the quote — or paint it yourself
- Photos of the finished bath in your job folder
How it is priced: per project
Quoted in writing from your photos within one business day. What moves the number:
- Size of the room and the tile pattern: straight-lay porcelain is fastest, small hex or herringbone takes longer
- Whether the vanity is a stock cabinet with a top or a piece that needs a top templated and cut
- Subfloor repair at the toilet or vanity if the old floor has been wet
- Replacing the door and casing vs. keeping them and painting
- Plumber time: a faucet and shutoff swap vs. a new tub or shower valve
- Tub surround or shower tile added to the job
- Painting the walls, ceiling and trim, quoted as a separate line
Send a photo from the doorway, one of the vanity and floor at the toilet, and one of the door and trim. Add a link or photo of the vanity you like and the quote is firm.
How long it takes
A hall bath with tile floor, vanity, trim and door: about four working days spread over a week and a half, with grout and paint drying time between. The plumber comes once near the end.
How your project works
- 1
Send photos, get a written quote
Send three photos of the space and a sentence about what you want. You get a clear, itemized quote within one business day. We only come out to measure first when the job needs a tape measure — no pressure, no games.
- 2
Pick materials, or bring your own
We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.
- 3
Clean, precise installation
The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.
- 4
Walkthrough and invoice
We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.
Situations and options
Floor and vanity only
Keep the door and trim, replace the floor and the vanity. The base gets pulled and reset on the new tile so there is no gap under it.
Full hall bath refresh
Tile floor, vanity and top, new base and casing, new door and hardware, mirror and light hung, walls and trim painted. Everything except the tub and toilet, and the toilet gets a new wax ring and seat.
Refresh plus tub surround
Add a tiled tub surround to the floor and vanity job. The surround needs a plumber for the valve and spout, and it adds about three days to the schedule.
Powder room
A half bath is a one-week job: floor, vanity, trim, paint. Pedestal sinks and wall-hung vanities need blocking in the wall, which we open and close before the tile.
Small Bathroom Remodel Contractor — Tile Floor, Vanity, Trim and Paint: questions, answered
Do you do small bathroom remodels without moving plumbing?
Yes, that is most of what we do in bathrooms. The tub, toilet and vanity stay where they are; the floor, vanity cabinet, top, trim, door and paint get replaced. The plumber reconnects everything in its existing spot. Moving a drain or a supply line means opening the floor or wall and is a bigger job we quote separately.
Who does the plumbing on a vanity replacement?
A licensed plumber. We set the vanity and the top, and the plumber connects the faucet, the drain and new shutoff valves, and resets the toilet. Anything that touches a supply, drain or valve is their work, not ours, and it is included in our quote as a line.
Should the tile go under the vanity or around it?
Under. We tile the whole floor and set the vanity on top of it. That way the toe kick sits on finished tile, there is no cut edge showing if the next vanity is a different size, and a leak under the sink lands on tile instead of plywood.
Can I keep my bathtub and just update the rest?
Yes. A sound tub with a working valve is worth keeping; a new one means the surround comes off and the plumber replaces the valve. If the surround tile is the dated part, a new tiled surround over the existing tub is an option, and it is priced as an add-on to the floor and vanity.
What does a bathroom refresh include for trim and doors?
New base to match the rest of the house or a new profile you pick, new casing on the door, and a new door and hardware if the old one is hollow and worn. Everything goes in primed, filled and caulked. Painting the trim and door is its own line on the quote, or you can paint it.
How long is the bathroom out of service?
The toilet is out for the day the floor is tiled and back the next day once the grout has cured. The sink is out from the day the old vanity comes out until the plumber hooks up the new one, usually three to four days. The tub or shower stays usable the whole time unless the surround is part of the job.
Get a written quote for this job
Three photos and a sentence is enough. You hear back within one business day. Or text the photos to 763-204-2099.
Related jobs we do
Bathroom Floor Tile Installation — Porcelain Set Flat and Level
Old vinyl or cracked tile out, the subfloor flattened and stiffened, new porcelain set flat with straight grout lines and the toilet reset — one crew from demo to the last bead of caulk.
Read moreShower Tile Installation — Waterproofed Walls, Pan and Niche
A tiled shower that stays dry behind the tile — membrane, pan and niche built as one system, then wall tile set plumb with the cuts where you never see them.
Read moreBaseboard & Casing Installation
Straight lines, tight miters, and coped inside corners — baseboard and window & door casing installed room by room or across your whole home.
Read moreInterior Door Installation & Replacement
Doors that close with a solid click, swing true, and match throughout the house — bedroom, bathroom, and closet doors installed by a licensed contractor who hangs doors for a living.
Read moreTrim Painting and Interior Door Painting After Installation
New trim is only finished when it is painted. We do that part too: fill, caulk, prime, enamel, and the doors sprayed flat, sequenced with the carpentry so the room is done once.
Read moreCracked Tile Repair — Replace Broken Tiles, Reset Loose Tile, Regrout
One cracked tile in the middle of the floor, a few that sound hollow, or grout that is crumbling out — fixed one tile at a time, without tearing up the room.
Read morePage reviewed September 24, 2026 · JMB Builders LLC, MN license BC809005 · All tile pages
Where we work
Tile near you
Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: