Shed Kit Assembly Service — Menards, Home Depot, Costco Kits
The shed came on a pallet with a 60-page manual and eleven bags of screws; we turn it into a shed that is square, anchored and shingled before dark.
JMB Builders is a shed kit assembly service for the Twin Cities metro and north to St. Cloud. You buy the shed kit at Menards, Fleet Farm, Home Depot, Lowe's or Costco; we build it on your prepared pad: floor frame and deck, walls, trusses, sheathing, shingles or metal roof, doors and windows, trim, and anchors into the pad. Wood, vinyl and metal kits. Priced per project, quoted from the kit's model number and a photo of the pad.
- Priced per project from the kit model and a pad photo
- Wood, vinyl and metal kits from any store
- Floor, walls, roof, shingles, doors and anchors
- Most kits built in one day on a ready pad
- Licensed MN contractor BC809005

A shed kit is a good buy right up until the pallet is in the driveway. The wood kits from Menards, Fleet Farm and Home Depot come as precut lumber, sheathing panels, a bundle of shingles and boxes of hardware, and they take two people, a level, a framing nailer and a full day to build well. The vinyl and resin kits from Costco and Lowe's are lighter but fussy: every panel has to be square to the one before it or the roof will not close. Most kits go up crooked because the floor was not square, and everything above copies the floor.
We build kits the way we frame anything. The floor frame is squared by diagonals on the pad and checked level before the deck goes on. Walls are built flat, stood, plumbed and braced. Trusses or the roof panels go on straight, the sheathing is nailed to the schedule the kit calls for, and the roof gets the drip edge, underlayment and shingles the kit supplied, or a better underlayment if you want it. Doors are hung so they swing, close and latch without dragging, which is the part homeowners most often give up on. The shed is anchored to the pad or the ground so a straight-line wind does not move it.
The pad has to be ready before we arrive: level, firm and a bit larger than the shed. If you do not have one, our gravel pad page is the job that comes first, and we can do both in one visit. Sheds that need a permit in your city, and electrical to the shed, are covered below.
What you supply
- The shed kit, delivered and kept dry, with all boxes and the manual; tell us the store and model number when you ask for the quote
- A level, compacted pad ready before we arrive, gravel or concrete, a bit larger than the shed footprint
- Any upgrades you want over the kit: better underlayment, a ridge vent, a lockset, a ramp
- Paint or stain if the kit is wood and you want it finished; painting is quoted as a separate line, or paint it yourself
What JMB supplies
- Inventory of the kit against the parts list before we start, so a missing part is found before it stops the job
- Floor frame squared and leveled on the pad, deck fastened
- Walls built, stood, plumbed and braced; trusses or roof panels set straight
- Sheathing nailed to the kit's schedule, drip edge, underlayment and shingles or metal roof panels
- Doors and windows hung square so they swing, close and latch; trim and corner boards on
- Anchors into a concrete pad, or ground anchors into a gravel pad
- Extra fasteners and shims the kit runs short on, and a framing nailer, compressor and ladders
- Packaging hauled away, and photos of the finished shed in your job folder
How it is priced: per project
Quoted in writing from your photos within one business day. What moves the number:
- Kit size and type: a small resin kit vs. a wood kit with a loft, or a gambrel roof with many trusses
- Shingled roof vs. a metal roof panel kit vs. a resin roof that snaps on
- Whether the pad is ready and level or needs building or correction first
- Extras: a ramp, a second door, a window, a loft, shelving inside
- Anchoring into concrete vs. ground anchors
- Painting or staining a wood kit, quoted as its own line
- Access: a backyard we can carry into vs. a long walk from the driveway
Send the store and model number of the kit, a photo of the pallet, and a photo of the pad. If the pad is not built yet, say so and we quote the pad on the same visit.
How long it takes
Most wood and resin kits up to a two-car-garage-door width: one day on a ready pad. A large wood kit with a loft or a gambrel roof: one and a half to two days. Add a day if we are building the pad first.
How your project works
- 1
Send photos, get a written quote
Send three photos of the space and a sentence about what you want. You get a clear, itemized quote within one business day. We only come out to measure first when the job needs a tape measure — no pressure, no games.
- 2
Pick materials, or bring your own
We help you choose profiles and materials that fit the house and the budget, or match your existing millwork exactly — or you buy the door or trim yourself and we install it. Everything is confirmed before the crew is scheduled.
- 3
Clean, precise installation
The crew shows up on time, protects floors and furniture, and installs with tight joints and consistent reveals. Photos of the finished work go in your job folder.
- 4
Walkthrough and invoice
We walk the finished work with you. If anything is not right, we fix it before we call the job done. Then one invoice, paid by check or direct deposit — no card fees, no payment links.
Situations and options
Wood shed kits (Menards, Fleet Farm, Home Depot, Lowe's)
Precut framing, OSB or LP panel sheathing, a shingle bundle and hardware. Built like a small house: floor squared, walls plumbed, trusses set, roof shingled with drip edge and underlayment. Doors hung square so they latch.
Resin and vinyl kits (Costco, Lowe's, Home Depot)
Lifetime, Suncast, Keter and similar panel kits. Every panel has to be square to the last, and the floor panels have to sit flat on a level pad or the roof will not close. We build them square and anchor them, which the manual assumes and most owners skip.
Metal shed kits
Arrow, ShelterLogic and similar steel panel kits. Hundreds of small screws and panels that bend if forced. Built on a squared base frame, anchored, with the doors adjusted so they slide or swing without binding.
Kit plus gravel pad in one visit
If there is no pad yet, we build a compacted class 5 pad with a timber border the day before or the morning of, then assemble the kit on it. One quote, one crew.
Upgrades while it is open
Better roof underlayment, a ridge vent, a real lockset instead of the kit hasp, a ramp for the mower, a loft, and shelving inside on the studs. Easy to add while the framing is exposed.
Shed Kit Assembly Service — Menards, Home Depot, Costco Kits: questions, answered
How long does it take to assemble a shed kit?
Most kits are one day for our crew on a ready pad: floor, walls, roof, shingles, doors and anchors. A large wood kit with a loft or a gambrel roof runs a day and a half to two days. Homeowners doing it themselves usually report two or three weekends, and most of that is squaring the floor and getting the doors to close.
What does the pad need to be before you build the shed?
Level, firm and a little larger than the shed footprint. Compacted gravel inside a timber or block border is the usual pad, and a concrete slab works too. A shed set directly on grass or on a few pavers will settle unevenly and the doors will stop closing. If you do not have a pad yet, we build one on our gravel pad page and can do both in one visit.
Do you anchor the shed down?
Yes, every one. On a concrete pad the floor frame or the base rails are anchored with concrete anchors; on a gravel pad we use ground anchors or auger anchors strapped to the frame. A shed that is not anchored is the one that ends up on its side after a summer storm.
Do I need a permit for a shed in Minnesota?
It depends on the city and the shed's size. Most cities exempt small sheds below a size threshold but still have setback rules from the lot lines and sometimes a limit on the number of accessory buildings. Larger sheds need a permit. Check your city's building page or call the desk before you buy the kit, and we can help read it. Any electrical to the shed is done by a licensed electrician who pulls that permit.
What if parts are missing from the kit?
We inventory the kit against the parts list before we start, so a missing or damaged part is found in the first half hour and not when the roof is half on. The store or the maker replaces the part; we finish everything that does not depend on it and come back for the rest. Common fasteners and shims we carry and just use.
Can you run power to the shed?
A licensed electrician does that, with a permit, and we are glad to coordinate the timing so the conduit goes in before the floor is down. We can frame for a light and an outlet location and leave the path open. The wiring itself is not our work.
Recent JMB work, from our job log
59 installs recorded across 30 Twin Cities communities since Dec 2025. Window and door installs for homeowners and for the builders and dealers we sub for. Counts come straight from our job log; no customer names.
Get a written quote for this job
Three photos and a sentence is enough. You hear back within one business day. Or text the photos to 763-204-2099.
Related jobs we do
Gravel Pad for a Shed or Hot Tub — Compacted Class 5 With a Border
The shed company delivers to a level pad and drives away; this is the pad — compacted, bordered, a little bigger than the shed, and draining so the floor does not rot from underneath.
Read moreShed Door Replacement — Site-Built or Purchased Door
The shed door drags on the ground, the bottom is rotted out, and the hasp does not line up anymore. We build or hang a new door and fix the jamb it hangs on.
Read moreShed Roof Replacement — Reshingle or Rolled Roofing on a Backyard Shed
The shed roof is green with moss, the plywood is soft under the shingles and the mower is getting rained on — a half-day reroof that nobody else wants to schedule.
Read moreGarage Shelving Installation — Heavy-Duty Built-In Garage Shelves
The plastic shelves are bowing, the totes are stacked on the floor, and the car does not fit. We build garage shelves out of framing lumber and plywood, anchored into the wall, that take real weight.
Read moreAndersen 100 and 400 Series Window Installation, Labor Only
The Andersen order is at the store or stacked on your driveway and the store's install program is weeks out. We set each window the way the printed guide says, on a sill pan, and trim it out inside.
Read moreAndersen 200 Series Narroline Sash Conversion Kit Install, Labor Only
The Narroline double hungs are original to the house, the frames are sound, and the conversion kits are ordered. Nobody at the store installs them.
Read morePage reviewed September 27, 2026 · JMB Builders LLC, MN license BC809005 · All install what you bought pages
Where we work
Install what you bought near you
Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: