Shingle Roof Replacement — Tear Off and Reroof
When the roof is done — curling, bald, losing granules by the gutter-full — it comes off to the deck and goes back on with the flashing, membrane and ventilation a Minnesota winter demands.
JMB Builders does full shingle roof replacement across the Twin Cities metro and north toward St. Cloud: tear-off to the deck, sheathing repair where it is soft, ice and water shield at the eaves and valleys, synthetic underlayment, new flashing, architectural shingles, and ridge and intake ventilation that actually moves air. Priced per project. We give a first quote from your photos within one business day and confirm it with a measured site visit before you sign.
- Full tear-off, never a second layer over the old
- Ice and water shield at eaves, valleys, penetrations
- Photo quote first, then a measured visit to confirm
- Licensed MN contractor BC809005

A reroof is mostly what you cannot see when it is finished. The shingle is the wear layer. Under it, ice and water membrane along the eaves and in the valleys is what keeps an ice dam from pushing water into the house, synthetic underlayment is the backup everywhere else, and new step flashing, drip edge and pipe boots are where the last roof probably leaked. We do all of it new. Nailing a second layer over the old shingles saves a dumpster and hides every soft spot in the sheathing; we do not do it.
Ventilation is the other half. A Minnesota attic needs intake at the soffit and exhaust at the ridge in balance, or the roof cooks in summer and grows ice dams in winter. Most older roofs we tear off have painted-shut soffit vents or a ridge vent with no intake to feed it. We check the soffits, cut the ridge slot properly and match exhaust to intake as part of the job, and we look at the attic insulation while we are up there.
The process starts with photos. Send a few from the yard and one from the attic if you can get in, and you have a quote the next business day. Then we come out with a tape and a ladder to measure the roof, count penetrations, check the decking and confirm the number before anything is ordered.
What you supply
- Photos of every roof slope from the yard, plus the attic underside if you can reach it
- Your shingle color choice from the samples we bring to the site visit
- Driveway space for the dumpster and material delivery
- Anything fragile off the walls and out of the attic before tear-off day; the house will shake
What JMB supplies
- Tear-off to the deck, dumpster, magnet sweep of the yard for nails
- Sheathing replacement where it is soft, quoted per sheet so there are no surprises
- Ice and water shield at eaves to the code line, in valleys and around every penetration
- Synthetic underlayment on the rest of the deck, new drip edge at eaves and rakes
- Architectural shingles, starter strip, hip and ridge caps, all new pipe boots and vent caps
- New step flashing at walls, kick-outs, chimney flashing rebuilt or replaced
- Ridge vent with the slot cut, soffit intake checked and opened up
- Photos of the deck after tear-off and the finished roof in your job folder
How it is priced: per project
Quoted in writing from your photos within one business day. What moves the number:
- Roof area and pitch — steep roofs take roof jacks and more time per square
- How many layers come off; two layers means twice the tear-off and the dumpster
- Number of penetrations, valleys, dormers and walls to flash
- Sheathing condition — plank decks and delaminated OSB add sheets
- Shingle grade: standard architectural vs. heavier or impact-rated lines
- Chimney flashing rebuild, skylight replacement, new bath fan caps added at the same time
- Access: how close the dumpster and delivery can get to the roof edge
A yard photo of each slope and one of the attic gets you the photo quote. The site visit is where we measure, check the deck and lock in the number.
How long it takes
Most single-family roofs: one to two days on site once material is delivered. Complex roofs with many valleys or a plank deck: two to three days.
How your project works
- 1
Photos in, quote out
Send photos of each slope and the attic. Within one business day you have a written quote that covers the roof as we can see it, with the assumptions listed.
- 2
Measured site visit
We measure the roof, count penetrations, probe the deck from the attic, check soffit intake and bring shingle samples. The quote becomes firm at this visit.
- 3
Tear-off and deck repair
Old shingles, felt and flashing come off to the deck. Soft sheathing gets replaced. You see photos of the bare deck before anything goes back on.
- 4
Dry-in and shingle
Ice and water shield, underlayment, drip edge, flashing and shingles go on in that order. Vents and boots are set as the courses reach them, not cut in afterward.
- 5
Cleanup and walkthrough
Magnet sweep of the yard and driveway, gutters cleared of debris, and a walk around the house with you. Finished photos go in your job folder.
Shingle Roof Replacement — Tear Off and Reroof: questions, answered
What are the cost factors for an asphalt roof replacement?
Area and pitch first, then the number of layers being torn off, how many valleys, walls, chimneys and penetrations need flashing, the condition of the sheathing, and the shingle grade. A simple gable ranch with one layer and a sound deck is the low end. A steep two-story with dormers, two layers and a plank deck is the high end. We list every one of these on the quote so you can see what moves the number.
How long does a roof replacement take?
One to two days on site for most single-family homes. Tear-off, deck repair and dry-in happen the first day so the house is never left open overnight; shingles finish the same day on smaller roofs or the next day on larger ones. Weather can push it; we do not tear off ahead of rain.
Can you put new shingles over the old ones?
We do not. A second layer hides soft sheathing, doubles the weight, keeps the old flashing in place and shortens the life of the new shingles because they cannot lie flat or shed heat. It also has to come off with the first layer next time. Tear-off costs more today and it is the only way to do the flashing and membrane right.
Do you need to come out before quoting a new roof?
Not for the first number. Photos from the yard and the attic get you a written quote the next business day. Before you sign we do a site visit to measure, check the deck and confirm the ventilation plan, because a full roof is one of the jobs where a tape measure changes the answer. The site visit locks the quote.
Architectural shingles or 3-tab?
Architectural. They are thicker, hold up better to Minnesota wind and hail, and the layered look hides the small waves in an older deck that 3-tab shows. 3-tab is still made and we will install it on a shed or a garage to match, but for a house the difference in cost is small next to the labor and the tear-off, which are the same either way.
Will you fix the ventilation while you reroof?
Yes, it is part of the job. We open blocked soffit vents, add intake where there is none, cut a proper ridge slot and install a ridge vent sized to the intake. If the attic insulation is thin or the hatch is uninsulated we will point it out; that work is quoted separately and it is the other half of stopping ice dams.
Get a written quote for this job
Three photos and a sentence is enough. You hear back within one business day. Or text the photos to 763-204-2099.
Related jobs we do
Roof Leak Repair — Pipe Boots, Valleys and Chimney Flashing
A brown ring on the ceiling, a drip down the furnace flue, water in the attic under a vent — we find where it gets in and fix that spot, not the whole roof.
Read moreIce Dam Roof Damage Repair and Prevention
The icicles were the warning; the stain over the window is the bill. We fix the eave, the sheathing and the ceiling, then air-seal and insulate the attic so the roof stays cold and the ice stays off.
Read moreHail Damage Roof Inspection and Insurance Claim Repair
After a hailstorm the question is simple: is there real damage, and is it enough to matter? We look, we document, and we tell you straight before anyone calls your insurance company.
Read moreRoof Vent Replacement, Pipe Boots and Flashing Repair
Cracked plastic box vents, sun-split pipe boots, a bath fan blowing into the attic — the small roof jobs that cause big leaks, done in one visit at a per-unit price.
Read moreAttic Insulation Blown In — Air Sealed First, Then Filled
Ice dams, a furnace that never shuts off, a bedroom that is cold at the ceiling: the attic is the first place to look and the best payback in the house when the air sealing is done before the fluff.
Read moreFascia Board Repair & Soffit Section Replacement
The gutter is pulling away, the fascia behind it is black and soft, and a soffit panel is hanging down. We replace the bad section, fix what caused it, and put the gutter back where it belongs.
Read morePage reviewed September 24, 2026 · JMB Builders LLC, MN license BC809005 · All roofing pages
Where we work
Roofing near you
Based in Zimmerman, scheduling across the Twin Cities metro. Closest first: